Pardon the dustWe’re giving the site a refresh. In the meantime, here’s what we do and how to reach us.
SALTAIR
Engineering & Advisory
Southwest Florida
Multidiscipline
A fresh look is on the way
Engineering that keeps your portfolio compliant.
Structural, civil, mechanical and electrical engineering for condominium, HOA and resort portfolios. Statutory compliance, restoration, turnover, forensics, permitting and owner’s representation.
Meanwhile, this page has everything you need to work with us.
HR-7020 Balcony and Railing Certification — every 3 years
Milestone Inspections, Phase 1 visual and Phase 2 testing
SIRS — Structural Integrity Reserve Studies
Local building recertification, where adopted
Condominium and HOA Hurricane Protection Specifications
Mechanical, Electrical & Life Safety
Fire sprinkler and Engineered Life Safety System retrofits (F.S. 718.112). Repiping and cast-iron replacement. HVAC and corridor pressurization. Electrical service and meter stacks. Public pool and spa plans sealed for DOH approval (Rule 64E-9).
Structural, Civil Engineering & Survey
Rooftop inspection & repair
Foundation settlement
Helical pier design
Balcony & stair inspection
Seawall inspection & design
Site plans & grading
Drainage & pavement repair
Boundary & topo survey
As-builts & elevation certs
Construction layout
Turnover, Forensic & Condition Assessments
Developer turnover inspections against plans and code
Latent defect and deferred-maintenance reports for the board
Forensic cause-of-distress investigations
Chapter 558 defect inspection support for association counsel
Property Condition Assessments (PCAs)
Concrete Restoration & Building Envelope
Spalling and delamination surveys, corrosion assessment, repair design and specifications. Post-tensioned slab and tie-beam repair. Column jacketing. Envelope assessments of walls, windows, doors, balconies and roofs. Leak investigation with moisture mapping and water testing. Waterproofing, stucco, sealant and coatings.
Owner’s Representative & Project Mgmt.
We sit on your side of the table. Scope, bid documents and contractor prequalification. Bid leveling and award recommendations. Change-order and pay-application review. Progress observation with board-ready reporting. Closeout and record drawings.
Permit Drawings & Permitting Services
All permit drawings required for new construction, additions, expansions and building restoration. Permit packages, agency submittals and plan-review comment resolution.
Condominium Storm Damage Restoration Engineering
Mobilized on emergency notice after a named storm.
ATC-45 Rapid and Detailed Safety Evaluation
Emergency shoring, stabilization and dry-in design
Load-path, lateral-system and envelope damage assessment
Wind-versus-flood causation for the association’s claim
Scope-of-loss quantification for the board
Substantial-damage and FEMA 50%-rule support (ASCE 24)
Sealed repair and reconstruction drawings for permit
We work for the HOA — never the insurance carrier.
Saltair responds every time — same day, or within 24 hours. Guaranteed.
1Assess→
2Report→
3Specify→
4Bid→
5Observe→
6Certify
Not on the list? Ask anyway.
If it is engineering and it is not environmental, Saltair can scope it, design it, and put a Florida seal on it.